Who Can Hold a Cashew Lot? QA, QC and the Release Signature

A certificate of analysis tells you what was measured. It does not tell you who had the power to say no. At peak season a plant has a container booked, a buyer waiting and a lot that is slightly off. What happens next depends on one thing: whether the person who finds the problem can stop the lot, or only report it.
That is the working difference between QC and QA.
QC checks the kernels, QA checks the system
Quality control (QC) is the checking of product. Someone takes a sample, measures moisture, counts whole kernels in a one pound (454 g) composite, scores defects and sends samples for aflatoxin or microbiology. The AFI specification for cashew kernels is mostly a list of what QC measures: moisture of 3% to 5% by loss on drying at 105 degrees C, a count range per size designation, tolerances for defects and limits for E. coli, Salmonella, Listeria and Staphylococcus.
Quality assurance (QA) is the system around those checks. The ISO 9000 vocabulary describes quality assurance as the part of quality management focused on providing confidence that quality requirements will be fulfilled. In plain terms, QA decides which checks exist, who is trained to do them, how the instruments are kept accurate, what a failing result triggers and who may release or reject a lot. Contrast that with QC, which is focused on the output of the process.
Two notes. First, ISO published a new edition of ISO 9000 on 27 May 2026 and withdrew the 2015 edition, so if an auditor or buyer quotes clause numbers from the old text, check them against the edition in use. Second, in a small plant one person may do both jobs. The point is not the job title. The point is that both jobs exist and that someone with authority can act on what the checks find.
| Topic | QC in a cashew plant | QA in a cashew plant |
|---|---|---|
| Moisture | Measures each lot by loss on drying; AFI range is 3% to 5% | Chooses and validates the method, keeps the balance calibrated, decides what happens to a lot above the limit |
| Count and size | Counts whole kernels in the one pound composite and reads the result | Fixes grade codes and tolerances in writing, trains and rechecks graders, keeps the reference samples |
| Defects and colour | Scores the sample against the tolerance table | Owns the scoring procedure and the reference samples it is judged against |
| Aflatoxin sampling | Draws the samples to the plan and sends them to the laboratory | Writes the sampling plan, approves the laboratory, decides what a result above the limit triggers |
| Foreign matter and metal detection | Looks for hard or sharp foreign objects and reads detector rejects | Sets the checks and their frequency, decides what happens to product behind a reject |
| Raw nut and supplier approval | Usually not involved | Approves raw nut and packaging suppliers, reviews incoming results |
| Internal audit and corrective action | Reports findings | Runs the audit schedule, tracks nonconformities to closure |
| Release authority | Reports results | Holds, releases or rejects the lot, and signs |
Who signs the lot release and the certificate of analysis
Ask for a name and a role, not a department. A release signature needs three things behind it: the results for that lot, a check that the lot codes match the packing list (the AFI specification asks for lot, production and date codes on cartons and on the packing list) and the authority to say no.
Some formal schemes treat release as a defined requirement. The BRCGS Food Safety standard lists product release as clause 5.7 of Issue 9, inside its product control requirement. We list the clause title only; the text is for certified sites and their auditors to read. If a processor says it holds a BRCGS certificate, verify the certificate with the issuing body and ask how your lot would pass that release step. This site holds no certificate and does not say that any plant holds one.
For US bound product there is a second name worth asking for. Under 21 CFR 117.180, one or more preventive controls qualified individuals must do or oversee preparing the food safety plan, validating preventive controls, reviewing records and reanalysing the plan. That person must have completed training equivalent to an FDA recognised curriculum or have equivalent job experience. This regulation does not say who signs a certificate of analysis, so do not treat the PCQI as the release signatory. Ask who the PCQI is, and who is the release signatory, and whether they are the same person.
What independence looks like at peak season
You cannot audit a plant from a video call, but you can ask how it behaves under pressure. Look for these signs:
- QA can put a lot on hold without asking the production or sales manager first.
- A hold is a physical thing: a tag on the cartons and an entry in the hold log with the lot number, the reason and the name.
- The person who releases is not paid on volume shipped.
- There is a named deputy for release, so that a signature is never “borrowed” when QA is away.
- A rejected lot has a written disposition decision. The AFI specification lists suggested remedies for non-conforming product, for example freezing a shipment when live infestation is found in two or more cartons. Someone has to decide to apply a remedy, and that decision belongs to QA.
A plant that says it has never held a lot is not necessarily lying. It may simply have no way of knowing, and that is what you are testing.
Need a price for this grade? Request a quote
Records that show QA works
Ask to see the blank forms and one filled example with the customer name covered. Three logs do most of the work.
| Record | What a good one shows | Red flag |
|---|---|---|
| Hold log | Lot number, date, reason, who held, decision and date of release or rejection | Empty for months, or entries with no decision |
| Nonconformity log | The failure, cause, action taken, and a check that the action worked | Same entry repeated with the same cause |
| Release log | Lot number, results checked, lot code match with packing list, name and date of release | One signature on many lots at once, dated after loading |
Add three supporting records: the internal audit schedule, the approved supplier list for raw nuts and packaging, and the calibration record for the moisture balance. AFI requires that all shipments be inspected prior to loading. Ask who does that and where the report sits in the release record.
Eight questions for the video call
- Who signs the release of a lot, by name and role, and who signs when that person is away?
- Who does QA report to, and can QA put a lot on hold without production approval?
- Show me the hold log for last month. What happened to the held lots?
- What result puts a lot on hold, and what does the plan say to do if an aflatoxin result comes back above the limit of my destination?
- Who approves raw nut suppliers and what happens to a raw nut lot that fails your own check?
- Who reads the laboratory report, who checks the lot code against the packing list and who issues the certificate of analysis?
- When was the last internal audit and what was the last nonconformity you closed?
- If my lot fails on the day before the container cut-off, who tells me, and what are the options?
The answers matter less than how fast they come. A plant with a working QA function answers questions 1 to 3 in one breath, because it does these things every week.
What to write into the spec
A clause you can paste into a purchase order or a spec sheet, adapted to your contract:
Release and certificate of analysis
1. Each lot is released in writing by [named role], who has the
authority to hold or reject the lot.
2. The certificate of analysis carries the lot, production and date
codes shown on the cartons and the packing list, the results and
the methods, and the name and role of the releasing person.
3. Seller keeps retained samples of each lot and sends two sealed
pre-shipment samples to buyer before shipment; one remains
sealed for use in a dispute.
4. On request, seller supplies the release record for the buyer's lots.
5. Seller notifies buyer the same day if a lot is placed on hold.
Point 3 follows the AFI note that two sealed pre-shipment samples are sent for approval, one of which stays sealed for settling a quality dispute. Pair this clause with the lines in the cashew spec sheet checklist, and use the nine checks in our supplier guide before the first order.
When you are ready to describe the grade, volume and documents you need, send them through the RFQ form. Put the release requirement in the first message so processors can answer it before they quote.
Sources
- Wikipedia, Quality assurance (quotes the ISO 9000 definition of quality assurance and contrasts it with quality control)
- ISO, ISO 9000:2026 Quality management, fundamentals and vocabulary (published 27 May 2026, replaces the 2015 edition)
- 21 CFR 117.180, requirements applicable to a preventive controls qualified individual and a qualified auditor (Cornell LII)
- ASC Food Safety, BRCGS for Food Safety Issue 9 changes, Part 5: Product Control (lists clause 5.7 Product release)
- AFI, Specifications for Cashew Kernels (updated September 2023)
Frequently asked questions
What is the difference between QA and QC in a cashew plant?
QC checks the product: moisture, count, defects and the samples sent for aflatoxin or microbiology. QA checks the system that decides what is checked, how, how often and what happens when a result fails. QA also holds the authority to stop a lot from shipping.
Who should sign the release of a cashew lot?
A named person whose role gives the authority to hold a lot and who is not rewarded for volume shipped. The name and role should be on the release record and on the certificate of analysis. Ask who signs when that person is away.
Does a BRCGS certificate prove the plant releases lots properly?
Not by itself. The BRCGS Food Safety standard has a product release requirement (5.7 in Issue 9), but a certificate tells you only that an audit found the system met the standard on the audit dates. Verify the certificate with the issuing body and still ask to see how your lot would be released.
What records show that QA works?
A hold log, a nonconformity log and a release log, each with dates, lot numbers and names. Add the internal audit schedule and the approved supplier list for raw nuts. If a plant has never put a lot on hold, ask how it knows.
VietCashew supplies Vietnamese cashew kernels on one quote. We publish no prices, because a cashew quote is only valid for days. How an order runs and what we publish.
Need a price for this grade?
Send the requirement. We reply within 24 business hours with one detailed quote for the packed kernels.
Request a quote